GLOBALG.A.P. Integrated Farm Assurance (IFA) Standard v6
Site management, biodiversity, energy, greenhouse gases and waste (FV-GFS 21 to 25) – GLOBALG.A.P. Integrated Farm Assurance (IFA) Standard v6

GLOBALG.A.P. Integrated Farm Assurance (IFA) Standard v6 FV-GFS 21.04: FV-GFS 21.04 The site is kept in a tidy and orderly condition.

The site is kept in a condition that prevents product contamination, and there is no rubbish or waste right next to production sites or storage buildings. Small, incidental amounts of litter in designated areas are acceptable, as is waste from the day's work; all other waste, fuel spills included, is cleaned up.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 4.1.2 4.1.2 External areas and traffic routes maintained

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Site management, biodiversity, energy, greenhouse gases and waste (FV-GFS 21 to 25) – GLOBALG.A.P. Integrated Farm Assurance (IFA) Standard v6

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.