Each audit has a confidential written report on the Foundation's mandatory template meeting Annex 2 and ISO/IEC 17021-1, available to authorities on request with the client's consent. It confirms every requirement was assessed with a verdict, verifies procedures and practice, justifies any not-applicable entry where the template allows it, records no scope exclusions, justifies plan deviations, states every nonconformity with requirement, finding, grade and evidence and the approved corrections and plans; head office reports summarise functions, interviews, files and findings. Photos may be annexed with agreement. The report reaches the client within two weeks of the decision, in English unless agreed otherwise, with Assurance Platform fields always in English and translations verified.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.