The application form captures the ISO/IEC 17021-1 minimum and the scheme's extra data, and the proposed scope is checked against the Annex 1 rules. The audit scope is the whole site and every worker, permanent, temporary, part-time and non-permanent such as contractors under the organisation's control; no exclusions are allowed.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.