EPA Risk Management Program (40 CFR Part 68)
Subpart C: Program 2 prevention program – EPA Risk Management Program (40 CFR Part 68)

EPA Risk Management Program (40 CFR Part 68) 68.56: § 68.56 Maintenance

The owner or operator must prepare and implement procedures to maintain the on-going mechanical integrity of process equipment (vendor, regulatory or industry-code procedures may be used); train each employee maintaining process integrity in the process hazards, how to avoid or correct unsafe conditions and the procedures for their tasks, with maintenance contractors ensuring their employees are trained; and perform or cause inspections and tests of process equipment following recognised and generally accepted good engineering practices, at frequencies consistent with manufacturers' recommendations, industry standards or codes, good engineering practice and operating experience.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 264.15 § 264.15 General inspection requirements
  • 264.174 § 264.174 Inspections

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Subpart C: Program 2 prevention program – EPA Risk Management Program (40 CFR Part 68)

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.