DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware 6.2.1: 6.2.1 Verification process objectives

Verification, by reviews, analyses and tests defined in the verification plan with assessment of results, assures the implementation meets its requirements; it may be applied at any level, repeatedly for safety requirements, and certain levels need independence (Appendix A). Hardware requirements verified during software, hardware/software integration or system verification may be credited, and changes may be re-verified through similarity, analysis, newly designed tests or repeating part of the original verification; informal testing helps find errors but earns credit only when formalised. Objectives: evidence that the implementation meets the requirements; traceability between hardware requirements, implementation, and verification procedures and results; acceptance test criteria identified, implementable and consistent with the functions' assurance levels; omissions and errors fed back.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • A-6.1 Executable object code meets the high-level requirements

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.