For buildings with commercial or industrial refrigeration: one credit for energy efficient design, installation and commissioning under a strategy that a suitably qualified engineer prepares from the concept design stage, with heat loads minimised, at least half of the listed design features specified, controls that minimise temperature lifts and sub-metering of plant performance; and up to two further credits where the indirect greenhouse gas emissions of the refrigeration system are assessed and shown to be within the benchmark levels of the manual's methodology.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.