For s 19 of the Act the PCBU ensures information, training and instruction given to a worker is suitable and adequate having regard to the nature of the work, the risks of the work at the time, and the control measures implemented, and ensures so far as reasonably practicable that it is given in a way each recipient can readily understand (language, literacy, format).
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.