Australia Model Code of Practice: Excavation Work 4.3b: 4.3 Implement traffic management and a SWMS where powered mobile plant is used

Where powered mobile plant is used for excavation work, traffic management arrangements must be implemented to stop collisions with pedestrians or other mobile plant, and excavation work that involves powered mobile plant needs a SWMS. Table 2 also names a traffic management plan as the example control for powered mobile plant, and the principal contractor's work environment arrangements include traffic management (3.1).