Australia Model Code of Practice: Construction Work 2.1e: 2.1 Obtain and provide underground essential services information before excavation (r 304)

Before excavation work starts, a person with management or control of the workplace must take all reasonable steps to obtain current underground essential services information for the workplace and adjacent areas, provide it to anyone engaged to carry out the excavation, and keep it readily available for inspection until the excavation is completed, or for 2 years after a notifiable incident connected with it; those given the information must have regard to it in carrying out or directing the work (WHS Regulations r 304). Sources include Before You Dig Australia and the commissioning client's records; relevant information is the services likely to be affected, their location and depth, and any conditions on the work. Builder and excavation subcontractor should agree who obtains it, and the builder should check subcontractors understand it before digging.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 45001:2018 · 1 control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 2: Specific duties relating to construction work – Australia Model Code of Practice: Construction Work

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.