AS/NZS 3010:2017 Electrical Installations Generating Sets
Section 2: General requirements for the installation of generating sets – AS/NZS 3010:2017 Electrical Installations Generating Sets

AS/NZS 3010:2017 Electrical Installations Generating Sets 2.7.2: 2.7.2 Operation of changeover devices: break before make, active and neutral switching, no earth switching

Changeover operation must never breach the neutral's integrity relative to the MEN connection: it must interrupt one source before connecting the other (unless a closed transition device is fitted); switch all active conductors; with MEN earthing, not disconnect the incoming normal supply neutral at the main switchboard holding the MEN link; where a neutral pole is switched, it must open no earlier and close no later than the other poles (or all poles operate substantially together if the neutral pole has full making and breaking capacity); and never operate in an earthing conductor.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 6.2.14-6.2.16 6.2.14 to 6.2.16 Motor load transfer, neutral isolation and nonautomatic switches

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 2: General requirements for the installation of generating sets – AS/NZS 3010:2017 Electrical Installations Generating Sets

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.