Where an installation can be supplied from more than one source, for example the distributor's network or a generating set, the system of supply presented to the installation's loads (for example MEN) must be the same whichever source is connected.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.