AS 7472:2018 Railway Operations - Management of Change
Clause 3: Management of change actions and process – AS 7472:2018 Railway Operations - Management of Change

AS 7472:2018 Railway Operations - Management of Change 3.3d: Evaluate impact, escalate high consequences and record removed controls

What does 3.3d require?

The proposed change's impact shall also be evaluated at this stage. When the assessment finds the change low risk, or a normal process for the operator, the remaining actions shall still be assessed in the context of the operator's risk management processes and its duty to reduce risk so far as is reasonably practicable. When the consequence is high, even if the probability is low, all six actions shall be carried out. Where a change removes an existing risk control, the decision shall be written down, stating which controls were removed, why, and how the associated risks will be managed.

Maintained by Gerard Blokdyk

Other controls in Clause 3: Management of change actions and process – AS 7472:2018 Railway Operations - Management of Change

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.