Where appropriate, the change should be checked for consistency with accepted codes or standards, or a decision taken that a new standard is required. Every decision in the process should be made transparently and formally accepted by the people responsible for decision-making within the operator.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.