Where more than one contractor will work on the project, the client appoints in writing a designer with control over the pre-construction phase as principal designer and a contractor as principal contractor, as soon as practicable and before the construction phase begins; if it does not, the client carries those duties itself.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.