UK Construction (Design and Management) Regulations 2015 (CDM 2015)
Part 2 Client duties – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

UK Construction (Design and Management) Regulations 2015 (CDM 2015) 4.5a: Construction phase plan in place before work starts

The client ensures that a construction phase plan is drawn up by the sole contractor or the principal contractor before the construction phase begins.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Part 2 Client duties – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.