UK Construction (Design and Management) Regulations 2015 (CDM 2015)
Part 2 Client duties – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

UK Construction (Design and Management) Regulations 2015 (CDM 2015) 4.5b: Health and safety file prepared, kept available and handed on

The client ensures the principal designer prepares a health and safety file that meets regulation 12(5), is revised to include new information and is kept available for anyone who needs it to meet legal requirements; on disposing of its interest in the structure the client passes the file to the acquirer and makes them aware of its nature and purpose (regulation 4(5)(b) and (7)).

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Part 2 Client duties – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.