The site confirms effective operation of freezing, chilling and cold storage, which are designed and built for hygienic, efficient refrigeration and easy inspection and cleaning (11.6.2.1); refrigeration capacity handles the maximum expected throughput with allowance for periodic cleaning (11.6.2.2); a written procedure sets temperature monitoring frequency and corrective action for out-of-specification temperatures, rooms have monitoring sited at the warmest point and an easily read, accessible display, and temperature records are kept (11.6.2.3); defrost and condensate discharge is controlled and sent to drains (11.6.2.4).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.