Openings cut in a floor to dispose of materials may not exceed 25 percent of the total floor area in aggregate unless the removed flooring's lateral supports stay in place. Floors weakened or made unsafe by demolition must be shored so they can carry the load that demolition imposes on them.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.