NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production
Production and Inspection

NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production 7: Production, Special Processes, Inspection, Testing, and Records

Control production and service provision per ISO 9001 Section 8.5 supplemented by AQAP 2110 production controls including: special process qualification (welding + heat treatment + plating + non-destructive testing per AWS + ASME + NADCAP), identification and traceability throughout production, control of monitoring and measuring equipment per ISO 10012 (calibration + traceability to national standards), inspection and testing per quality plan, control of nonconforming outputs with material review board (MRB) disposition, and records control per ISO 9001 Section 7.5 with NATO-specified minimum retention of 10 years from contract completion.

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.