NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production
5.4 Operation – NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production

NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production 5.4.1.2.1: 5.4.1.2.1 Manage configuration to ACMP 2100 across planning, identification, change control, status accounting and audit

The Supplier runs all five configuration management functions (planning, identifying configuration items, controlling changes, accounting for configuration status and auditing configuration) to ACMP 2100 (the NATO configuration management contractual requirements) plus any further configuration terms the contract adds, or an equivalent the nation recognises. SRD.1: CM is scaled to product complexity and life-cycle stage, and linking configuration audits to acceptance avoids duplicate assurance; ISO 10007 and national equivalents are recognised practice. SRD.2: AS9100D 8.1.2 requires CM; the contractual basis in ACMP 2100 is the NATO part. Base clause: ISO 9001:2015 8.5.2 and 8.5.6 (identification, control of changes); ISO 10007 informative.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in 5.4 Operation – NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production