NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production
5.4 Operation – NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production

NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production 5.4.4: Determine verification and validation methods and show conformity at stages up to the final product

What does 5.4.4 require?

Unless the contract specifies otherwise, the Supplier decides how each requirement will be verified and validated and shows conformity at suitable points of development, through to the finished product. SRD.2: sits on AS9100D 8.3.4, which already covers reviews, verification and validation. Base clause: ISO 9001:2015 clause 8.3.4 (design controls).

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in 5.4 Operation – NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.