NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production
5.3 Support – NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production

NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production 5.3.4: 5.3.4 Make contract staff and External Providers aware of the quality plan arrangements

Everyone involved with the contract, External Providers included, is aware of the specific arrangements in the quality plan that apply to their activities or area of responsibility. SRD.1: awareness reaches anyone working under the Supplier's control, subcontractors included, and is checked by shop-floor interviews. Base clause: ISO 9001:2015 7.3 (awareness).

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in 5.3 Support – NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.