The infrastructure the Supplier determines and maintains includes a designated area in which nonconforming product is segregated, supporting the control of nonconforming product in 5.4.12. SRD.1: where physical segregation is impractical (large assemblies, temporary sites) positive control through stock-system status and physical tagging or locking is accepted. Base clause: ISO 9001:2015 7.1.3 (infrastructure).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.