The project identifies the integration constraints including interfaces that influence requirements, architecture or design, defines the approach and checkpoints for confirming correct operation of assembled interfaces and functions, makes the enabling systems available, integrates the system from its implemented elements, checks the interfaces between elements and between the system and its external environment, identifies integration results and anomalies and establishes traceability of the integrated elements; software integration is typically continuous, with items held in libraries under configuration control. Activities: prepare for integration, perform integration successively, manage the results.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.