The project describes the system or element, with its interfaces, functions and boundaries, defines its requirements of every kind (functional, performance, process, non-functional, interface) and the design constraints, defines critical performance measures, analyses the requirements, makes the enabling systems available and develops traceability from system/software requirements to stakeholder requirements; requirements avoid implying a particular implementation as far as constraints permit. Activities: prepare, define requirements, analyse requirements, manage requirements.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.