The project identifies the implementation constraints that influence requirements, architecture or design, realises each system element (by construction, acquisition of packages or reuse of existing elements, according to the chosen implementation technology), packages or stores the element, makes the enabling systems available and establishes traceability; software implementation runs alongside verification and validation and usually concurrently with integration. Activities: prepare for implementation, perform implementation, manage the results.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.