Make sure that the key characteristics of the operations that influence energy performance are identified, and that at planned intervals they are measured, monitored and analysed. Draw up and apply a plan for collecting energy data that suits the organization's size and complexity, its resources and its measuring equipment. The plan names the data required to monitor those key characteristics and says how, and how often, the data are gathered and kept; it covers the relevant variables for SEUs, both SEU-level and organization-wide energy consumption, the operating criteria for SEUs, static factors, and any data that action plans call for. Review the plan and bring it up to date at defined intervals. Make sure measuring equipment yields data that are accurate and repeatable, and keep documented information on how accuracy and repeatability are established.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.