Set one or more EnBs from the energy review information, covering a period that is suitable. Where the data show that relevant variables have a significant effect on energy performance, normalize the EnPI values and the EnBs that correspond to them. Revise the EnBs when the EnPIs have stopped reflecting energy performance, when the static factors have changed significantly, or as a method fixed in advance requires. Keep the EnBs, the data on relevant variables and any changes as documented information.
This control maps to 3 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 3 it maps to, and the evidence behind each claim, over MCP and REST.