ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 3:5.8.2: 5.8.2 Review and continue maintenance of the AIM

What does 3:5.8.2 require?

The appointing party reviews whether the AIM still meets 5.1.11 and is maintained under 5.1.12, and applies suitable mitigating measures where either is not met.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 55001:2024 · 1 control

  • 7.6 Data and information

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.