ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-3:2020 operational phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 3:5.1.13: 5.1.13 Establish the asset information protocol

The appointing party sets up an asset information protocol defining the rights and obligations of itself and the appointed parties regarding the AIM, and builds it into each appointment. It considers duties for managing or producing information, including CDE use; warranties or liabilities tied to the AIM; intellectual property in the AIM, both background and foreground; how reference information and shared resources may be used; use of information during the appointment and any licence terms; and reuse once the appointment ends or is terminated.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 27002:2022 · 1 control

  • 5.20 Addressing information security within supplier agreements

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ISO 19650-3:2020 operational phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.