ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-3:2020 operational phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 3:5.4.4: 5.4.4 Establish the task information delivery plan(s)

What does 3:5.4.4 require?

Each task team prepares a TIDP and keeps it current for the whole appointment, considering the asset management delivery milestones, what the detailed responsibility matrix assigns to it, the EIR (ISO 19650-3) issued by the lead appointed party, the reference information and shared resources available to the team, and how long it needs to produce its information. For every container the TIDP gives a unique ID and title, any dependencies or predecessors, the level of information need, how long production is expected to take, the responsible information author, and the delivery milestones.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 9001:2015 · 1 control

  • 8.3.2 Design and development planning

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ISO 19650-3:2020 operational phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.