ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-3:2020 operational phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 3:5.1.9: 5.1.9 Establish the common data environment

What does 3:5.1.9 require?

The appointing party sets up the CDE under ISO 19650-1 clause 12 as a combination of workflow and storage solutions supporting the process for its assets, able to: give every container a unique ID under an agreed, documented convention; assign status, revision and classification (ISO 12006-2) to each container; move containers between states; keep a journal recording the user, date and time of every state transition; and control access at container level.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 15489-1:2016 · 1 control

  • 5.3.1 5.3.1 Records systems: design objectives

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.