The information model shall be reviewed by the appointing party in line with the production methods and procedures, considering the deliverables in the MIDP, its EIR, the acceptance criteria and the required level of information need. Where the review succeeds, the model is accepted as a CDE deliverable; if not, it is rejected and the lead appointed party is told to correct and resubmit it. The model is accepted or rejected as a whole, not in parts.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.