ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-2:2018 delivery phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 2:5.7.2: 5.7.2 Review and authorize the information model

What does 2:5.7.2 require?

The information model shall be reviewed by the lead appointed party in line with the production methods and procedures, considering the deliverables in the MIDP, the EIR of the appointing party, its own EIR, the acceptance criteria and the level of information need attached to every requirement. If the review succeeds, it authorises the model and tells the task teams to submit it for the appointing party's acceptance; if not, it rejects the model and tells them to amend and resubmit. The model is authorised or rejected as a whole, not in parts.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 9001:2015 · 1 control

  • 8.3.5 Design and development outputs

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.