ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-2:2018 delivery phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 2:5.6.2: 5.6.2 Generate information

What does 2:5.6.2 require?

Each task team shall produce information according to its TIDP. The information shall comply with the information standard and with the production methods and procedures; it shall not go beyond the level of information need, stray outside the container breakdown element allocated to the team, duplicate information from other task teams or carry unnecessary detail; it shall be coordinated and cross-referenced with information shared in the CDE; and geometric models shall be spatially coordinated with other shared models of suitable suitability. The teams resolve coordination issues together or refer them to the lead appointed party.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 9001:2015 · 1 control

  • 8.5.1 Control of production and service provision

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ISO 19650-2:2018 delivery phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.