Each task team shall produce information according to its TIDP. The information shall comply with the information standard and with the production methods and procedures; it shall not go beyond the level of information need, stray outside the container breakdown element allocated to the team, duplicate information from other task teams or carry unnecessary detail; it shall be coordinated and cross-referenced with information shared in the CDE; and geometric models shall be spatially coordinated with other shared models of suitable suitability. The teams resolve coordination issues together or refer them to the lead appointed party.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.