ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-2:2018 delivery phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 2:5.4.7: 5.4.7 Complete appointed party's appointment documents

The lead appointed party shall make sure the documents appointing each appointed party contain, under change control, its EIR, the information standard and the information protocol each with the amendments agreed, the BEP for the delivery team, and the TIDP as agreed.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 10007:2017 · 1 control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ISO 19650-2:2018 delivery phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.