ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-2:2018 delivery phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 2:5.4.1: 5.4.1 Confirm the delivery team's BIM execution plan

What does 2:5.4.1 require?

The lead appointed party shall, together with each appointed party, agree and confirm the BEP: confirm who the people managing information are; revise the delivery strategy and the high-level responsibility matrix where needed; confirm and write up the proposed production methods and procedures; settle with the appointing party any additions to the information standard; and confirm the list of software, hardware and IT to be used.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 10007:2017 · 1 control

  • 5.2 Configuration management planning

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ISO 19650-2:2018 delivery phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.