Each task team shall assess its capability and capacity to deliver against the EIR and the proposed BEP: to manage information (experience and number of members, education and training), to produce information (experience with the production methods and procedures, training) and the availability of IT (the proposed schedule, hardware specification and quantity, infrastructure architecture, capacity and utilisation, support and service levels).
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.