A manufacturer must design and build each product to the applicable accessibility requirements and, before placing it on the market, compile the technical documentation under Schedule 2, carry out (or have carried out) the internal production control conformity assessment, and once conformity is shown draw up the EU declaration of conformity and affix the CE marking.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.