EPA RCRA Hazardous Waste Management
Part 262 Subpart M: LQG preparedness, prevention and emergency procedures – EPA RCRA Hazardous Waste Management

EPA RCRA Hazardous Waste Management 262.263: § 262.263 Amendment of contingency plan

The plan must be reviewed and immediately amended if necessary whenever the applicable regulations are revised, the plan fails in an emergency, the facility changes in design, construction, operation, maintenance or other circumstances in a way that materially increases the potential for fires, explosions or releases or changes the response needed, the list of emergency coordinators changes, or the list of emergency equipment changes.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 10.1.3 10.1.3 Re-evaluation on changes in regulations, hazards, resources, organisation, funding, infrastructure, stability, operations or critical suppliers

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Part 262 Subpart M: LQG preparedness, prevention and emergency procedures – EPA RCRA Hazardous Waste Management

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.