DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware 7.2.4: 7.2.4 Change control

Change control records, evaluates, resolves and approves changes under the CM plan, starting no later than the credit baseline. It protects items against unauthorised change; assesses whether the configuration identity must change; records, approves (per the authority in the CM plan) and tracks changes; keeps each change traceable to its reason; assesses the change's impact on process outputs and updates the output data (some activities may need repeating, and changes to manufacturing tools, processes or external components may affect the design); and provides feedback to affected processes.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • A-8.3 Problem reporting, change control, change review and status accounting in place
  • 5.6.2 5.6.2 Configuration management process activities

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 7: Configuration management process – DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.