DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware 7.2.2: 7.2.2 Baseline establishment

Baselines provide the basis for later work and for control of and traceability between items: baselines are set for items used for certification credit (intermediate baselines optional); established baselines are under change control; derivative baselines follow change control; and where credit is claimed for work or data of a previous baseline, the new baseline traces to it.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • A-8.2 Baselines set and traceability kept

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 7: Configuration management process – DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.