Baselines are established and each configuration item can be traced to the baseline or data it came from. Table A-8 objective 2, described in 7.1.b; applies at levels A, B, C, D, no independence required; activities 7.2.2; outputs Software Configuration Index, SCM Records.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.