Previously developed hardware use is stated in the PHAC with CM and process assurance addressed. Modifications (from requirement changes, errors found, enhancements, procurement problems) are analysed by reviewing the system safety assessment outputs, applying 11.1.4 if the assurance level rises, and analysing the impact of the change including re-verification beyond the changed area, determined by signal flow, functional, timing or traceability analysis.