For reuse in a new installation, the system safety assessment sets the new assurance level and certification basis (no further work if equal or less stringent); functional modifications follow 11.1.1; and if the previous development did not produce the outputs the new safety objectives need, 11.1.4 applies.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.