DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware
Section 11: Additional considerations – DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware

DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware 11.2.2: 11.2.2 COTS component procurement

Procurement issues with significant assurance impact are for the applicant to manage and resolve, notably the actual availability of COTS assurance data, batch-dependent parameter variations that robustness tests may miss, evolving component technology, and components becoming non-procurable.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • COTS-3 COTS-3 Use outside manufacturer specification
  • IP-3 IP-3 Complementary development assurance for COTS IP

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 11: Additional considerations – DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.