The operator gives the regulator a completed safety case within 24 months of determination, prepared in accordance with the safety case outline and containing summaries of hazard identification (with all major incidents listed), the safety assessment, the emergency plan and the SMS, security arrangements, the worker consultation and the Schedule 18 matters, with information needed to keep it accurate and current; it demonstrates that the SMS will control major incident risks and that the controls are adequate, and includes a signed statement (for a body corporate, by the most senior executive officer resident in the jurisdiction) on accuracy, understanding of risk, adequacy of controls and competence of those implementing the SMS. Where the regulator requires co-ordination between facilities, operators share information on hazards affecting each other (without compromising security); and the operator revises the safety case after any r 559 review.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.