The licensed removalist gives the regulator written notice at least 5 days before starting licensed removal work, or, where a sudden event or essential service breakdown requires immediate removal, by telephone immediately and in writing within 24 hours, including removalist, licence and supervisor details, the clearance inspector, the client, the workplace and location, dates and duration, friable or non-friable, enclosure method for friable work, estimated quantity, number of workers and each worker's competency.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.