The licensed removalist prepares an asbestos removal control plan for each licensed job covering the method, tools, equipment and PPE and the location, type and condition of the asbestos, gives a copy to the person who commissioned the work, and keeps it until the work is complete (at least 2 years after a notifiable incident), readily accessible to PCBUs and workers at the workplace, their HSRs and, for residential premises, occupants, and available for inspection.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.