Where a worker entering a trench could be engulfed, the Code recommends that shoring, benching or battering be used whatever the depth of the trench. The Code states this as a recommendation separate from the 1.5 metre trigger in WHS Regulation 306, so a shallow trench carrying an engulfment risk should still have its sides supported.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.